Grab a cup of tea, and let’s sign you up

In this first step we will capture information about yourself.

Additionally your representative if you have one and the address of the property/site in question. If at any point you get stuck, don’t worry, one of our advisors can call you back.

1. What products would you like to apply for today?*

Products

Please note that we cannot offer quotation for water as a standalone quote.

We only offer water quotation if combined with gas, electricity or both, or if your site requires 10 or more water connections.

2. Are you enquiring about a single property or multiple?

3. Which of these best describes you?*

Please select as many as you feel are relevant

Which of these best describes you?

Tell us about you and your site.

We’ll use these details to contact you about your application, and to locate the property or site you need connecting.

1. Please tell us your details

2. Tell us about your project

Is the work being managed by yourself or a representative?*

3. Provide property details

Is the address of the property/site you are enquiring about the same as your address?*

We understand this can be a long and complex form to complete.

If you need a hand finishing this form, would you like one of our advisors to give you a call?*

Now let’s establish your planning permission plans.

In this section we need to know if you have planning permission, when you need your quotation, and a couple of extra bits of info on the property/plot.

1. Has planning permission been granted for the development?*

2. What date do you need your quotation by?

We need at least 21 days to prepare your quotation.

3. Anticipated project start date?

4. Please verify your property site details*

Is the property Grade listed?*
Will the works require shared or private land that you do not own?*

Let’s establish your plot requirements and how many connections you will need.

Tell us how many plots need connecting, which services each needs and when you need them.

1. How many plots in total require connections?*

2. Please indicate your schedule of properties

How many properties of each size are on the development? If you can’t give the full schedule now, you can upload it in the documents section below.

4. Would you like a budget estimate or a detailed quotation?*

Please note a budget estimate is a guide only and is based on an assumed point of connection for all utilities required. It is not a quotation that can be accepted.

6. Are there any future developments we should know about?*

Upload your supporting documentation.

In this section please upload your site plans and any supporting documentation.

Please note we cannot move your application to the next stage until these documents have been uploaded.

1. Upload your Site Layout Plan

This should show the building/plots and surrounding area.

Maximum file size 25MB

2. Upload your Location Plan

This should show the development in relation to nearby roads.

Maximum file size 25MB

3. Upload your Schedule of Properties

If you didn’t enter your full schedule of properties above, please upload it here.

Maximum file size 25MB

Example document

It’s important that we understand the desired location for your meters.

Upload your meter plans and show us where on the building you would like your meters positioned.

Please submit your plans clearly labelled with a key that indicates whether the meter is gas, water or electricity and whether they are internal or external.

1. Please upload your plans here for all meters*

Maximum file size 25MB

Example document

2. Please tell us about your meter positions*

Is the connection required for a new build or an existing property?*

3. Type of meter box required?*

4. Where would you like your meters?*

Please be advised that it is usually not accepted to have a meter position at the rear of the property, unless the existing gas supply is located at the back of the property.
Would you like your meters to be internal or external?*
Please indicate where you would like to position the meters*
Rear Side BUILDING Side Front

Final confirmation, congratulations you are nearly at the end.

Please check the site address below and confirm the declarations to send your application.

Your site address will appear here once you’ve entered it above.

By clicking ‘Sign’ you confirm the information in this application is accurate to the best of your knowledge.*